If you're researching what's included in metallic epoxy floors, the short answer is: a multi-layer system, not a single product poured onto concrete. A properly installed metallic epoxy floor includes surface preparation, moisture testing, a primer or base coat, the metallic pigmented coat itself, and usually at least one clear protective topcoat. It also includes a conversation that should happen before any work starts: every metallic pour is one of a kind, and the pattern in your floor cannot be reproduced exactly from a photograph or a sample board. That's a feature of the product, not a flaw, but you deserve to hear it upfront rather than after the floor is down.

This page walks through each stage of a standard installation so you know what you're paying for and what to expect on the day. For the broader picture on the product itself, see the main guide to metallic epoxy floors.

1. Consultation and Expectation Setting

Before any quote, a reputable installer will talk through the look you want and show you sample boards or photos of completed work. This is also where the one-of-a-kind point gets made clearly: metallic epoxy moves as it cures. The pigments swirl, settle, and shift based on temperature, humidity, floor geometry, and how the installer works the material. Two floors using the same colours and the same technique will look related, not identical.

What a good consultation includes:

If a contractor promises to replicate a Pinterest photo exactly, treat that as a red flag.

2. Surface Preparation

This is the stage most customers never see, and it's where most floor failures actually originate. Included in every proper installation:

Skipping or rushing preparation is the single most common cause of peeling and delamination. It's also the stage where quotes can differ dramatically, so when comparing bids, ask exactly what prep method each contractor includes.

3. Primer and Base Coat

After prep, the floor gets a priming coat that penetrates and seals the concrete, followed by a coloured base coat — usually a solid epoxy or polyaspartic layer that matches or complements the metallic colours going on top. The base coat does two jobs: it provides a consistent colour backdrop so the metallic pigments read true, and it evens out absorption so the metallic layer cures uniformly.

4. The Metallic Pour

This is the headline act, and what's included here is:

The pour itself is usually done in a single working session because the material has a limited window where it remains workable. Larger areas may be sectioned, which is another reason to discuss seams and pattern flow during the consultation.

5. Clear Topcoats

Metallic epoxy floors are typically finished with one or more clear coats — often a polyaspartic or polyurethane. These layers add abrasion resistance, UV stability (some epoxies amber under sunlight), and chemical resistance. In most quotes, expect:

Ask which topcoat system is included and whether an anti-slip finish is standard or an upgrade.

6. Curing, Cleanup, and Handover

A complete installation includes the cure schedule and a clear handover: when light foot traffic is allowed (often 24–48 hours), when furniture can go back, and when the floor reaches full cure and chemical resistance (commonly several days to a week, depending on the system). Cleanup of the work area and proper disposal of materials should be part of the job, not an extra.

7. Warranty and Aftercare

Installed floors should come with a written warranty on workmanship — meaning the installer stands behind the bond, the preparation, and the application. Get the terms in writing before work starts, including what voids the warranty (typically improper maintenance or sub-floor changes made after the fact). Alongside the warranty, you should receive straightforward care instructions: neutral cleaners, no abrasive pads in the early weeks, and prompt cleanup of harsh chemicals.

What Affects Cost

No honest contractor can quote metallic epoxy without seeing the floor, but the main cost drivers are:

Ranges vary by region and system, so treat any online per-square-foot figure as a starting point only, not a quote.

Ready to Get a Straight Answer?

If you want a floor that's built properly and priced transparently — with the one-of-a-kind caveat explained before the pour, not after — send us the details through the quote form on our website. Tell us the approximate square footage, the space's use, and the look you're after, and we'll come back with a clear breakdown of what's included and what it costs.