If you've been researching metallic epoxy floors: what to expect on the day is probably your last unanswered question before booking. This page walks through the whole installation day, step by step, so there are no surprises. If you want the broader picture first - suitability, design options, and long-term care - start with our metallic epoxy pillar page, then come back here for the practical detail.
Every metallic pour is one of a kind. The pigment moves, swirls, and settles differently each time, so the finished pattern cannot be reproduced exactly from a photograph - not ours, not anyone's. A sample board gives you a realistic indication of colour and movement, never a guarantee of the exact layout. We say this plainly before work starts rather than after, because it's the single most common misunderstanding in this product category. If you need identical floors in two rooms, metallic epoxy is the wrong material; if you want a floor nobody else has, it's exactly right.
Installation day goes smoothly only if the slab is ready. The concrete needs to be sound, dry, and free of coatings, oils, and curing compounds. If we're doing the prep, that usually happens on the day itself or the day before. If another contractor is handling prep, coordinate timelines carefully - a rushed grind shows through the finished floor.
Clear the area completely: vehicles out of the garage, equipment off the warehouse floor, belongings out of the space. Epoxy is tacky for hours and cures over days, so nothing goes back in until we say so.
1. Final prep and cleaning (1-2 hours typically). The crew grinds or shots the slab if not already done, vacuums thoroughly, and checks for cracks or joints that need filling. Moisture readings may be taken if there's any doubt about the slab.
2. Priming or base coat. A base layer goes down first. This seals the concrete and gives the metallic pigments a controlled surface to move across. Depending on the system, this may need a short cure window before the next step.
3. The metallic pour. This is the part people remember. Mixed epoxy with metallic pigment is poured in sections and spread with squeegees and rollers. Then the crew works the surface - encouraging the pigment to flow, fold, and settle into the marbled, three-dimensional effect metallic epoxy floors are known for. Timing here is everything; the material stays workable for a limited window, so the crew works steadily rather than slowly.
4. Detail work and edges. Edges, corners, and transitions get hand attention. If a clear topcoat is part of your system, it's applied once the base has reached the right cure stage - sometimes the same day, sometimes the following day depending on conditions and product.
5. Barriers and leave. The area is closed off - tape, signage, whatever the site needs - and the crew walks you through the cure schedule before leaving.
Foot traffic is usually possible within 24 to 72 hours, with light use first. Full chemical cure and heavy loads - vehicles, pallet jacks, machinery - typically take several days to a week. Temperature and humidity affect these windows, so we give you a specific schedule for your site rather than a generic one. Follow it. Putting a car on a floor two days early is the most common way people damage an otherwise perfect installation.
We don't publish firm prices because slab condition, square footage, prep requirements, and system choice change the number significantly. Broadly, metallic epoxy sits at the premium end of resin flooring: expect more than a solid-colour epoxy coating, with prep work on a damaged or coated slab being the biggest variable. You get a fixed quote after a site inspection, not a guess.
Installed floors are covered by a written warranty on workmanship - the actual document sets out the terms, and it's honoured, not just issued. Day-to-day care is simple: neutral cleaner, soft broom or mop, no abrasive pads. Ask the crew on the day for the specific do's and don'ts for your system.
If you've read the metallic epoxy pillar page and this page and you're happy that a one-of-a-kind floor is what you want, the next step is a site visit and a firm quote. Use the quote form on our website - tell us the space, the rough dimensions, and what the floor needs to put up with, and we'll take it from there. No phone tag, no pressure.