What's included in Epoxy Floor Repair and Recoat

If you're comparing quotes for an epoxy floor repair and recoat, the scope of work matters more than the price on the bottom line. Two contractors can quote the same floor very differently because they're planning to do very different things. This page lays out what's normally included in an epoxy floor repair and recoat, what's usually excluded, and how to tell when a recoat is the wrong answer entirely.

The short version: a proper recoat includes surface preparation, repair of the defects that actually caused the problem, a fresh build coat, and a finish coat — with the contractor telling you up front if the floor is too far gone for a recoat to hold.

What a Recoat Covers

A recoat is appropriate when the existing epoxy is still well bonded to the concrete and the problems are cosmetic or shallow — dull spots, scuffing, minor wear in traffic lanes, light surface staining, or small areas where the top coat has worn through.

A standard recoat scope includes:

Assessment of the existing coating. Before anything else, the floor gets checked for adhesion. That means pull testing in a few spots, checking for hollow-sounding areas, and looking at how the coating was originally applied. This step is what separates a recoat that lasts from one that peels within a year.

Mechanical surface preparation. The floor is diamond-ground or shot-blasted to create a profile the new coats can bond to. Acid etching is not adequate preparation for a recoat in a commercial or industrial space — anything less than mechanical prep is where quotes get cheap and results get short.

Spot repairs. Cracks, chips, gouges, and small spalled areas are filled or patched before coating. Larger structural slab issues are a different conversation (more on that below).

Repair coating and build coat. Repaired areas are sealed with compatible material, then a full build coat goes down to restore film thickness across the floor.

Finish coat. The final coat provides the colour, gloss, and wear surface. Depending on the environment, this may include an anti-slip additive.

Cure and handover. You get told when the floor can take foot traffic and when it can take forklifts or other loads. Those times vary with product and temperature, so they get confirmed on the job, not guessed.

What's Not Included

Knowing the exclusions is just as useful as knowing the scope:

When a Recoat Is the Wrong Answer

This needs saying plainly: sometimes a recoat is the wrong answer, and the floor needs taking back to concrete. Coating over a failing floor is the most common way recoats fail early. The signs that point to full removal instead:

The honest position is that this gets said before the work, not during. A contractor should identify full-strip conditions at assessment stage and quote accordingly. If someone finds "surprises" mid-job that double the price, the assessment wasn't done properly. Our epoxy floor repair pillar page covers the full repair process in more depth, including when removal and reinstallation is the only sound option.

What Drives the Cost

We don't publish firm prices because every floor is different, but the main cost drivers are consistent:

  1. Condition of the existing coating. A floor needing spot repairs costs less than one needing extensive patching — and far less than one needing full removal.
  2. Preparation required. Heavier grinding, more shot-blasting time, or contamination removal all add labour hours.
  3. Square footage. Bigger floors cost more in total but usually less per square metre.
  4. Number of coats and specification. A basic recoat and a high-build system with anti-slip finish are different jobs.
  5. Access and scheduling. Working around production hours, weekends, or phased areas affects how the job is planned.

Most recoat jobs land in a modest per-square-metre range when the existing coating is sound, and step up meaningfully when repairs or partial removal are involved. A site assessment is the only way to give you real numbers.

Warranty

Floors we recoat are covered by a written warranty on workmanship. The specific terms are set out in your paperwork before work starts — what's covered, what's not, and for how long — so there's no ambiguity after handover.

Getting a Quote

The process is straightforward: send us the details through the quote form on our website, including rough floor size, what the floor is used for, and what's gone wrong with the existing coating. Photos of the problem areas help. We'll arrange an assessment, tell you honestly whether a recoat or a full strip-back is the right call, and quote the job properly before any work starts.