If you've booked concrete grinding and surface preparation: what to expect on the day is fairly predictable, even though every slab is different. Most clients haven't been through the process before, so this page walks through a typical working day — arrival, setup, grinding, cleanup, and handover — so you can plan your site and your schedule around it.
One thing worth stating up front: most coating failures are preparation failures, not product failures. When an epoxy or sealer lifts, peels, or flakes months after installation, the cause is almost always a slab that wasn't properly ground, cleaned, or dried before the coating went down. That's why we treat grinding and prep as the most important part of the job, not a step to rush through.
A few things make the day go faster:
The crew arrives, walks the slab, and confirms the scope against the quote. Setup includes dust extraction connected to the grinders, plastic sheeting over adjacent areas or doorways if needed, and safety signage. Grinding generates serious noise — hearing protection for anyone staying on site is sensible, and it's worth warning neighbouring tenancies.
If the floor is occupied (a warehouse or workshop that stays partly operational), the crew will usually section the work so you keep an access route. Confirm this at quote stage, not on the day.
Grinding removes the weak surface layer, old coatings, adhesives, and contamination, and opens the slab so a coating can bond mechanically. Typical stages:
How long it takes depends on slab condition, not floor size alone. A clean, bare slab in good order grinds far faster than one with old epoxy, adhesive residue, or years of oil soak. Hard, steel-troweled slabs and dense aggregate also slow production. That's why quotes are given per job after inspection rather than as a flat per-metre figure — the condition of your slab is the main cost driver, along with total area, access, and the finish spec.
A quote that skips grinding is not cheaper. It's shorter-lived. Saving a day of prep can cost you a full recoat in a year or two.
Dust extraction catches the vast majority of grinding dust, but fine powder still settles. The crew vacuums the floor and the work zone, removes sheeting, and walks the area with you. If a coating is being applied the same day or the next, the slab will be checked for moisture and residual dust before anything goes down — prep and coating are sequenced, not rushed.
If prep is being done as a standalone job (for your own applicator), handover includes the profile achieved and any slab defects found during grinding, so there are no surprises later.
Small residential or small commercial floors are often prepped in a day. Larger industrial slabs run over multiple days, particularly with coating stages included. Your quote will state the expected duration and any cure or drying windows that affect when the floor can take traffic.
Workmanship is backed by our written warranty on installed floors — the terms and duration are set out in that document, and we honour it.
Every slab is different, so the honest answer on timing and cost comes from looking at yours. For a scope, timeframe, and cost drivers specific to your floor, send through the details via the quote form on our website — include the floor size, current surface condition, and what's going over it. You can read more about the full process in our concrete prep guide.