Epoxy Floor Repair and Recoat in West Bloomfield, MI

If your resin floor is worn, peeling, or lifting under forklift tyres, epoxy floor repair and recoat in West Bloomfield MI can often restore it without the cost of a full tear-out. But not every failing floor is a recoat candidate — and telling you that up front is part of the job. This page explains how we assess an existing floor, what we can repair, and when the honest answer is that the floor needs to be taken back to concrete.

We serve commercial and industrial properties throughout West Bloomfield and the surrounding Oakland County area. For a broader look at repair methods, see our main page on epoxy floor repair.

What We Repair and Recoat

Most of the floors we bring in for epoxy floor repair and recoat work show one or more of these problems:

How We Assess an Existing Floor

Before quoting anything, we test the bond between the existing coating and the concrete. That usually means cutting test patches, checking moisture in the slab, and looking at how the original floor was installed. The findings determine which of three paths makes sense:

  1. Repair and recoat — the existing coating is still well bonded. We mechanically prepare the surface, patch localized damage, and apply new build coats. This is the least disruptive option and keeps most operations running.
  2. Repair and re-profile — the coating is sound in places but failing in others, or the surface profile is wrong for recoating. We remove the failing areas, re-profile the whole floor, and rebuild.
  3. Strip back to concrete — when delamination is widespread or the original installation was fundamentally unsound, recoating over it just moves the failure forward a year. In that case, we remove the old coating entirely and start fresh.

If a recoat is the wrong answer, you'll hear that during the assessment — before any work is scheduled, not partway through the job.

Cost Drivers (No Firm Prices Here)

Every floor is different, so we don't quote blind. What moves the cost up or down:

You'll get a written, itemized quote based on what the assessment actually found.

Typical Timeline

A straightforward recoat on a few thousand square feet is commonly a 2–4 day job including prep and cure. Floors needing strip-back to concrete take longer — often a week or more depending on square footage and how much coating has to come off. We'll give you a realistic schedule with the quote, including cure times before the floor can take traffic.

Why Property Managers in West Bloomfield Use Us

We're a local contractor, not a franchise. Every installation is backed by a written warranty on workmanship — the terms are in the contract, in writing, and we honour them. If something we installed fails, we come back and make it right.

Get an Assessment

If your floor is peeling, worn, or lifting, send us a few photos and your square footage through the quote form on this website. We'll schedule an on-site assessment, tell you plainly whether repair and recoat is viable, and quote accordingly — whether that's a recoat, a rebuild, or an honest recommendation to start over.