You prepare for polyaspartic and polyurea coatings by making sure the concrete slab is clean, dry, structurally sound, and free of any previous coatings or sealers that could block adhesion. In practice, the contractor handles the grinding and prep work — your job is mostly to clear the area and flag anything you know about the slab's history.
Here's what matters before we quote or install:
Clear the space. Move vehicles, equipment, and stored items off the floor. We need open access to grind the surface properly. Anything glued down should be removed beforehand if possible.
Know the slab's history. Tell us if the concrete is new (under 30 days old), if it's been sealed, painted, or coated before, or if you've seen moisture issues like damp patches or efflorescence. Moisture vapour transmission is the main reason coatings fail, so we test for it where history is unclear.
Expect diamond grinding. Proper prep means mechanically grinding the surface to open the concrete's pores. That's non-negotiable for adhesion — acid etching or skipping prep is where most coating failures start.
Plan around downtime. One of the real advantages of polyaspartic and polyurea coatings is fast return to service — often light foot traffic the same day, full use shortly after. But that depends on the system spec, the ambient temperature, and the condition of the slab, so it's quoted per job rather than promised as a blanket rule. We'll give you a realistic timeline with your quote.
Cost context. Pricing depends on square footage, prep intensity, crack and joint repair, and the number of coats. Every job is quoted individually — there's no flat rate.
For the full system breakdown, see our polyaspartic guide: Polyaspartic coatings explained.
Installed floors come with a written warranty on workmanship, so if something goes wrong because of the install, it's covered in writing — not just verbally.
Ready for a quote? Fill out the quote form on our website with your floor's approximate size and a short description. We'll assess the slab and come back with a per-job price and timeline.