A typical metallic epoxy floors installation takes 2 to 4 days from prep to light foot traffic, with full cure taking up to a week depending on conditions. Most of that time is surface preparation and curing between coats — the metallic pour itself is done in a day.
Day 1 — Prep. Grinding or shot-blasting the concrete, repairing cracks, and cleaning. This is the step that determines whether the floor bonds properly, so it doesn't get rushed. A heavily damaged slab may add time.
Day 2 — Primer and base coat. The base coat goes down and needs to cure enough to accept the metallic layer, usually overnight.
Day 3 — The metallic pour. This is the showpiece day. The pigmented epoxy is poured, moved, and worked to create the pattern. Once it's down, it needs to sit undisturbed.
Day 4 (or later) — Clear topcoat. A protective clear coat goes over the cured metallic layer. Light foot traffic is usually fine a day or two after this; heavy use, furniture, and vehicles should wait several more days while it fully cures.
Every metallic pour is one of a kind. The pattern cannot be reproduced exactly from a photograph, no matter how similar the colours and technique. We say this plainly before work begins, not after — you're choosing a direction and a finish, not an exact replica.
Costs depend on square footage, slab condition, and the finish you choose. There's no flat price that fits every floor — that's why we quote each project individually. Installed floors come with a written warranty on workmanship.
Learn more in our full guide: Metallic Epoxy
Get an accurate timeline for your floor — submit the quote form on our website with your space details and we'll come back with a realistic schedule and cost range for your project.